
Oak & Line Renovation Denver, CO
Just the kitchen or bathroom?
Get a quote for that room
On-site measure and a 3D layout before you commit
Tell us which room and how much you want to change, and we'll book a time to measure and send an itemized quote.
- Kitchen and bathroom remodels
- Itemized quote after measuring
- Schedule shared up front
Single-room remodels at Oak & Line Renovation
- One room
- Just the kitchen or bathroom
- On site
- Quote confirmed after we measure
- Itemized
- Demolition, plumbing and finishes listed separately
- Schedule
- Day-by-day plan for the work
Before we quote
First we agree
how far to go
- 01
Kitchen: full replacement or a refresh
If the cabinet boxes are still sound, you may only need new countertops and doors. If storage is the problem, we look at a new layout.
- 02
Bathroom: tile over or strip out
Tiling over existing tiles and stripping everything back take different amounts of time and money. If there are leaks or loose tiles, we recommend a full strip-out.
- 03
Waterproofing and plumbing
When a bathroom is stripped out, we lay new waterproofing and check the drains and pipes at the same time.
- 04
Living through the work
We tell you in advance which days the kitchen or bathroom will be out of use, so you can plan around them.


Worth a call when
One room in the house
is bothering you
· The grout in the shower has turned dark and the water drains slowly
· Cabinet doors are sagging or the countertop is lifting
· You'd like to swap the bathtub for a walk-in shower
· You want a new kitchen and bathroom before you move in
How it works
What happens after you ask
- 1
Request a quote
Choose the room, the scope, your type of property and timing.
- 2
Phone chat and photos
Upload a few photos of the room as it is now, and we can give you a rough scope before we visit.
- 3
Site visit and measure
We take measurements and check the plumbing, drainage and tiles.
- 4
Itemized quote
You get a quote that lists demolition, plumbing, waterproofing and finishes separately, plus a schedule for the work.
- 5
Work begins
We sort out any building approvals, let nearby residents know, and start on the agreed date.
A few photos of the room
and we can give you a rough scope
You can upload photos right in the form. No photos handy? We'll tell you how to send them by phone.
Request a quoteQuestions
How long does a bathroom remodel take?
It depends on whether we tile over or strip out, and how much waterproofing is needed. After measuring, we give you a day-by-day schedule.
Can I stay at home during the work?
Yes. Demolition days are noisy and dusty, and if it's your only bathroom there will be days you can't use it. We'll tell you which ones in advance.
Can you replace just the countertop?
Yes. We check the base cabinets and replace only what's needed: the countertop, doors, faucet and so on.
Can I get a quote without committing?
Yes. Take the itemized quote away and compare it in your own time.
What if something goes wrong after the work?
The warranty period and what it covers are written into your contract. If a problem comes up within that period, we come back and fix it.
Kitchen or bathroom quote
Answer a few quick questions and we'll call you.
Thanks, your quote request is in
We'll call during business hours to look at your photos and arrange a time to measure.
If it's urgent, call (555) 010-0104.
Our office
- Address
- 000 Main Street, Suite 200
- Hours
- Mon–Fri 9am–6pm
Saturday site visits by appointment - Phone
- (555) 010-0104
Photos on this page are AI-generated for illustration. The final quote and timeline are confirmed after measuring on site and may change depending on the materials you choose and the condition of the plumbing and waterproofing.